// The first line should include the project name // The second and on at the same level will be the upper level // To add a sub level, use the TAB key // To get a numbered items, click at the bottom of the page on the: // "To get your Work Breakdown Structure outline with WBS code click here!" // and scroll down to copy your text // // To manage your status and budget, register for free // This example is used for educational purpose Drinking Bottle PBS Container Strengthening Label Thread Cover Thread Drinking liquid Water Sweets Flavors